Intensive Care Unit Renewal, EAMC

Location
Ft. Gordon, GA
Project Size
7,020 GSF
Project Type
Design-Build
Market
Federal-Healthcare
Intensive Care Unit Renewal, EAMC
The project design provided a combine Medical Intensive Care Unit and Surgical Intensive Care Unit via renovation of the existing Medical Intensive Care Unit, located on the fifth floor of EAMC. The majority of the interior walls at the ICU suite were demolished with the exception of walls surrounding the stairs, mechanical chase, and some minor rooms. All interior finishes were removed along with all lighting and plumbing fixtures. New interior spaces were defined by new metal studs and gypsum board walls with glass partitions at the corridor side of the patient rooms. New floor finishes were seamless sheet vinyl. Steel structural supports for new overhead service booms and pendants as well as modifications to utilities and HVAC were installed prior to the installation of new ceilings. New plumbing fixtures were provided along with new built-in Nurses’ Station and individual work stations at each patient room. Built-in counters and cabinets were provided at ancillary spaces such as the Staff Lounge, Nourishment Center, Med Prep, and Soiled Linen.


Project Type
Design-Build
Market